Steps To Your Own Water Supply
1. Initial consultation and project viability.
2. Feasibility study showing hydrological survey, waterwell drilling location in relation to existing incoming main, budget costs of installation and payback. If favourable report, agree to test borehole.
3. Obtain consent to drill from Environment Agency for water abstraction and drill test borehole to establish water quality, water volume and water treatment required if any. Project costs and payback reappraised and agreed.
4. Proceed with borehole drilling and installation and license application.
G.E.
liaise throughout with the Environment Agency (not required in Scotland) and undertake all paper work covering site surveys, permission to drill and license application and cover all legal
requirements. |